This guide is on repacking the Bridge for shipping.
If you have the RMA kit, please start at Part 1.
If you have the original packaging, please start at Part 2.
PART 1: Preparing the Inserts
Included in your Bridge RMA kit are the inserts used to keep the Bridge in place during transport. You will receive two inserts for both sides of the bridge. Begin by taking one of the inserts and laying it out flat.
2. Begin by taking the flaps circled in red as shown on the picture on the left and bringing them together as shown on the picture on the right.
3. Next, take the larger flap and use it to enclose the two smaller flaps, like as shown in the picture.
4. Next lock the flap in by using the two tabs circled in the left picture and pushing the flap into the two holes circled in the right picture.
5. Repeat the steps on the other side. With both flaps secured, your insert should now look like the image on the left.
6. Next, close the insert by taking the two flaps shown in the image and putting it inside the insert.
7. Ensure that the two flaps are inside the insert before closing it.
8. Next, take the two remaining flaps and insert them into the slots as shown in the image.
9. Ensure that both flaps are inserted before pushing them all the way in.
10. The first insert should now be completed, now repeat the steps to complete the other insert in the pair.
PART 2: Packing the Bridge
1. Before packaging the Bridge there are a few steps that are needed to be done. To begin, put the main display of the Bridge in the full upright position if it is not already.
2. Next, take the biodegradable bag included with your kit and insert your Bridge inside. Ensure that one corner of the main display and bring it all the way inside to one corner of the bag.
3. Now the bridge is ready to be packed. To begin, take your left insert and laying it flat on a table. You will know that it is your left insert by checking the slot circled in red and seeing no foam blocking it.
4. Next, carefully place the bridge into the left insert ensuring that the cardboard insert remains unbroken. After the Bridge is secured in the insert, tuck the leftover part of the bag into the bridge.
5. Next, while the Bridge is on its side within the left insert, place the second insert on the exposed side of the Bridge.
6. With the Bridge secured between the two inserts, bring the Bridge within the inserts to an upright position. Then, take the long strip of cardboard included with your kit and fold it at the pre-folded points as shown in the image below.
7.With the strip of cardboard folded at the points mentioned above, put the strip underneath the bridge with the folded points facing up as shown in the image below. Please take note the side with the longest part without folds is on the main display side and the part with the two folds next to each other is on the customer display side.
8. Gently fold the piece around the Bridge. If done properly the cardboard strip shouldnβt need extra folds to wrap around the bridge properly. The spot where there are two folds next to each other should also be at the top of the main display with one of the ends strips covering part of the main displays top part.
Next take the part of the strip with no folds and wrap it around the main display. The other end of the strip should overlap the other end of the strip.
9. With the strip now wrapped around the Bridge, take some tape, and secure the cardboard strip in place.
10. Finally, prepare the carton included by taping the bottom of the carton.
11. Next, by holding the bridge by the inserts, carefully place the Bridge inside the carton.
PART 3: Packing the Power Supply
1. Included in your kit is a small whit box to place your power supply in.
2. Begin by unfolding the white box and folding down the two flaps shown in the image on the left.
3. Next, fold down the remaining flaps. Take the first flap and push it down gently. There should be two tabs that lock into the two slots of the box.
4. Next take the remaining flap and push it down gently into the slot. The box should be fully assembled now at this point.
β
Carefully place the power supply inside of the box and seal it.
5. You can place the power supply box on the smaller side of the packaging, where the main screen would be.
6. Your Bridge should now be properly packed and ready to be shipped!